A Professional Engineer's stamp confirms your solar design can safely handle real-world structural and electrical loads — and many AHJs won't approve a permit without one. Our licensed PE stamping service covers both structural and electrical review, in-house, for residential and commercial solar projects nationwide.
Our licensed engineers review your existing plan set or design — checking structural loads, electrical calculations, and code compliance before stamping begins.
We verify racking and attachment calculations, wind and snow load ratings, and electrical sizing against NEC and local code requirements before submission.
Once verified, our licensed Professional Engineers apply their stamp and signature — making your plan set legally ready for permit submission.
no third-party handoffs or delays
even on stamped documentation
coverage for state-specific PE requirements
work directly with your assigned engineer
every stamp backed by full calculation support, not a rubber-stamp process
A structural stamp certifies racking, attachment, and load calculations. An electrical stamp certifies system sizing and single-line diagrams. Many AHJs require both.
Yes — we review and stamp existing plan sets, as long as they meet code requirements after our verification.
Yes — we match your project with an engineer licensed in the relevant state, since PE licensing is state-specific.
Standard PE stamping is completed within our 6-hour max turnaround window, faster for straightforward projects.
Yes — most installers combine design and PE stamping into a single, fully approval-ready package.